Automated Frame Assembly

By scanning bar code information on the component label or through direct input into the CNC control, the SAC-100 automated press will accurately, consistently, and simultaneously position itself to assemble all four screen frame components at once. Preloaded corner key cartridges automatically and precisely insert corner keys for screen frame assembly.

The quick-change cartridge system allows for minimum down time between corner key changes. Estimated typical cycle time for a 24″ x 36″ window screen frame is approximately 35 seconds, including all handling. Optional off load conveyor is available to send the finished product to the next workstation.

Learn More